Masset council has unanimously approved an application for up to $100,000 to develop a coastal flood plan, four years after a study identified vulnerable roads near the entrance to the village and along the shoreline near the hospital.
If funded, the plan would be the village’s first direct follow-up on recommendations from the 2022 Haida Gwaii Coastal Flood and Erosion Study, chief administrative officer Joshua Humphries told Haida Gwaii News. The village is applying through the Union of BC Municipalities’ Foundations of Disaster Risk Reduction program. Humphries said addressing risks to key roads is expected to be a priority.
The study modelled storm-wave flooding and tsunamis under scenarios with one and two metres of sea-level rise. In the study’s severe storm scenario with one metre of sea-level rise, floodwaters could reach sections of Highway 16 approaching Masset, including the intersection with Hodges Avenue and Towhill Road. The study also identified a flood-prone stretch of Harrison Avenue and Raven Road near the hospital. B.C. recommends that communities plan for one metre of sea-level rise by 2100, Humphries said.
The proposed plan would weigh the costs and benefits of ways to reduce flood risk and would likely identify which actions should come first. The 2022 study recommended examining the benefits and drawbacks of seawalls and sloped rock barriers called revetments. It noted that those structures can protect one stretch of shoreline while increasing erosion nearby or affecting intertidal habitat.
Humphries said the village would post the finished plan on its website. Designing any new infrastructure would require a future funding application, and construction would need its own funding. Other grant programs can cover part of those construction costs, he said.
The village is also updating how it prepares for emergencies. In October 2025, Masset appointed Amirou Ba as its first emergency coordinator. Humphries said Ba is assessing local hazards and updating the village’s emergency plan to include coastal flooding risks. Masset has also contributed funding to the All-Island Emergency Planning Committee, which began meeting monthly in September.